Power house foundation work at E.Z. Co. Zinc Works
- AU TAS UTAS ITCCD 2018/6-15
- Stuk
- 1930
Black-and-white photograph shows foundation of power house 4th unit being built at E.Z. Co. Zinc Works at Risdon
Power house foundation work at E.Z. Co. Zinc Works
Black-and-white photograph shows foundation of power house 4th unit being built at E.Z. Co. Zinc Works at Risdon
Looking north to cell room extension at E.Z. Co. Zinc Works
Black-and-white photograph of construction of cell room extension at E.Z. Co. Zinc Works at Risdon. Large sign reading “SAFETY” is mounted at ground level.
Workmen preparing footings for expansion at E.Z. Co. Zinc Works at Risdon
Black-and-white photograph depicts workmen preparing footings for expansion of power house at E.Z. Co. Zinc Works at Risdon
Excavation work for construction of furnace at E.Z. Co. Zinc Works
Black-and-white photograph shows workmen beginning excavation of site for new Derwent Prime furnace
Derwent Prime furnace jacket assembled at E.Z. Co. Zinc Works
Black-and-white photograph shows men assembling Derwent Prime furnace at E.Z. Co. Zinc Works at Risdon
Framework of roasting division building at E.Z. Co. Zinc Works at Risdon
Black-and-white photograph shows framework and construction of roasting division building at E.Z. Co. Zinc Works at Risdon, above railway line, with stockpile of logs and timber above railway cutting; Mount Faulkner in background
Black-and-white photograph shows an elevated view of the cell room building, the roasting division and other buildings under construction, looking west, with Mount Faulkner in the background 1921
View of construction site uphill at E.Z. Co. Zinc Works at Risdon 1924
Black-and-white photograph shows view of new building on site, looking uphill, at E.Z. Co. Zinc Works at Risdon 1924